Naval Weapons Station Seal Beach Logo Commander, Navy Region Southwest  |  Naval Weapons Station Seal Beach
Commander, Navy Installations Command

Find Your Region or Installation

Documents

Base-Wide Documents  
Final Base-wide Well Decommissioning Report 12.5 MB 5/2015
Final Base-wide Well Decommissioning Plan 5.2 MB 12/2014
Draft Base-wide Well Decommissioning Plan 8 MB 10/2014
IR Program Fact Sheet (2007) 4.9 MB 10/2007
IR Program Fact Sheet (2002) 2.3 MB 7/2002
IR Program Fact Sheet (1993) 6.4 MB 9/1993
IR Program Fact Sheet (1992) 563 kb 11/1992
Munitions Response Program  
Draft Remedial Investigation for Munitions Response Program Sites UXO1, UXO6, and AOC2 85 MB 8/2018
Final Remedial Investigation Work Plan for Munitions Response Program Sites UXO1, UXO6, and AOC2 43 MB  7/2017 
Draft Remedial Investigation Work Plan for Munitions Response Program Sites UXO1, UXO6, and AOC2 42 MB 11/2015
Final Site Inspection Report for Munitions Response Program Sites UXO1, UXO2, UXO6, AOC1, and AOC2 23 MB 1/2011         
Munitions Response Program Draft Site Inspection 14 MB 9/2010
Munitions Response Program Draft Site Inspection Work Plan & Sampling and Analysis Plan 22 MB 4/2009
Munitions Response Program Draft Final Preliminary Site Inspection 12 MB 12/2008
Munitions Response Program Draft Preliminary Site Inspection 75 MB 8/2008
Site 7 - Station Landfill  
NEW!  Site 7 Fall 2018 & Winter 2019 Annual Post-closure Inspection and Maintenance Report 18 MB 10/2019
Site 7 Fall 2017 & Winter 2018 Annual Post-closure Inspection and Maintenance Report 23 MB  3/2019 
Site 7 Fall 2016 & Winter 2017 Annual Post-closure Inspection and Maintenance Report 20 MB  10/2017 
Site 7 Fall 2015 & Winter 2016 Annual Post-closure Inspection and Maintenance Report 14 MB  3/2017 
Site 7 Fall 2014 & Winter 2015 Annual Post-closure Inspection and Maintenance Report 14 MB 11/2015
Site 7 Fall 2013 & Winter 2014 Annual Post-closure Inspection and Maintenance Report 12 MB 10/2014
Site 7 Fall 2012 & Winter 2013 Annual Post-closure Inspection and Maintenance Report 47 MB 10/2013
Site 7 Fall 2011 & Winter 2012 Annual Post-closure Inspection and Maintenance Report 20 MB 8/2012
Site 7 Final Fall 2010-Winter 2011 Semiannual Post-Closure Inspection And Maintenance Report 4.6 MB 7/2011
Site 7 Final Fall 2009-Winter 2010 Semiannual Post-Closure Inspection And Maintenance Report 2.6 MB 5/2010
Site 7 Final Winter 2008-2009 Semiannual Post-Closure Inspection And Maintenance Report 4 MB 7/2009
Site 7 Draft Winter 2008-2009 Semiannual Post-Closure Inspection And Maintenance Report 6.8 MB 5/2009
Sites 5 and 7 Third Annual Final Groundwater Monitoring Report 4 MB 6/2007
Sites 5 and 7 Second Annual Final Ground Water Monitoring Report 13 MB 9/2006
Site 7 Draft First Semiannual Post-Closure Inspection And Maintenance Report for 2006 1.3 MB 6/2006
Sites 5 and 7 Second Annual Draft Ground Water Monitoring Report 11 MB 5/2006
Site 7 Second Semiannual Post-Closure Inspection And Maintenance Report for 2005 2.1 MB 4/2006
Sites 7 & 4 Draft Action Memorandum/Remedial Action Plan 1 MB 9/2003
Sites 7 & 4 Engineering Evaluation/Cost Analysis Addendum 2.1 MB 7/2003
Site 7 Engineering Evaluation/Cost Analysis 21 MB 5/2002
Site 22 - Oil Island  
Site 22 Site Management Plan 2009 Annual Report 4 MB 6/2009
Site 40 - Concrete Pit/Gravel Area  
Site 40 Final Site Closure Report 10 MB  3/2017 
Site 40 Draft Site Closure Report 6 MB  12/2016 
Site 40 Draft Annual Groundwater Monitoring Report 2014 20 MB  2/2016 
Site 40 Final Annual Groundwater Monitoring Report 2013 41 MB 8/2014
Site 40 Draft Annual Groundwater Monitoring Report 2013 17 MB 5/2014
Site 40 Final Annual Groundwater Monitoring Report 2012 22 MB 9/2013
Site 40 Draft Annual Groundwater Monitoring Report 2012 26 MB 7/2013
Sites 40 and 70 Final Five-Year Review Report (2005-2010) 5 MB 11/2012
Sites 40 and 70 Draft Five-Year Review Report (2005-2010) 5 MB 9/2012
Site 40 Final Annual Groundwater Monitoring Report 2011 8.5 MB 7/2012
Site 40 Draft Annual Groundwater Monitoring Report 2011 11 MB 5/2012
Site 40 Long Term Monitoring Final Sampling and Analysis Plan 28 MB 11/2011
Site 40 Final Comprehensive Monitoring Report (2005-2010) 39 MB 3/2011
Site 40 Draft Comprehensive Monitoring Report (2005-2010) 32 MB 12/2010
Site 40 First Semiannual Performance Monitoring Report 18 MB 6/2006
Site 40 Final Record of Decision / Remedial Action Plan 3.4 MB 5/2004
Site 40 Proposed Plan 2.6 MB 8/2003
Site 70 - Research, Test and Evaluation Area  
Site 70 Final 2017 Performance Monitoring Report 12 MB 6/2019
Site 70 Final 2016 Performance Monitoring Report 85 MB 2/2019
Site 70 Draft 2016 Performance Monitoring Report 86 MB 3/2018
Site 70 Final Tier II Sampling and Analysis Plan 15 MB  11/2016 
Site 70 Final 2015 Performance Monitoring Report 17 MB  9/2016 
Site 70 Draft 2015 Performance Monitoring Report 72 MB  6/2016 
Site 70 Final 2014 Performance Monitoring Report 92 MB 10/2015
Site 70 Draft 2014 Performance Monitoring Report 10 MB 5/2015
Site 70 Final 2013 Performance Monitoring Report 73 MB 11/2014
Site 70 Draft 2013 Performance Monitoring Report 70 MB 8/2014
Site 70 Final 2012 Performance Monitoring Report 89 MB 10/2013
Site 70 Draft 2012 Performance Monitoring Report 47 MB 7/2013
Site 70 Final 2011 Performance Monitoring Report   95 MB 1/2013
Sites 40 and 70 Final Five-Year Review Report (2005-2010) 5 MB 11/2012
Site 70 Draft 2011 Performance Monitoring Report   90 MB 9/2012
Sites 40 and 70 Draft Five-Year Review Report (2005-2010) 5 MB 9/2012
Site 70 Final Performance Monitoring Report for 2010 53 MB 8/2011
Site 70 Draft Performance Monitoring Report for 2010 12 MB 4/2011
Site 70 Draft Performance Monitoring Report for 2009 3.2 MB 5/2010
Site 70 Draft Baseline Groundwater Monitoring Report 17 MB 4/2009
Site 70 Final Remedial Action Work Plan 17 MB 3/2008
Site 70 Final Well Installation Phase Technical Memorandum 3.3 MB 1/2008
Site 70 Final Remedial Design 36 MB 12/2006
Site 70 Final Record of Decision and Remedial Action Plan 9.1 MB 8/2006
Site 70 Draft Remedial Design 30 MB 8/2006
Site 70 Draft Record of Decision 17 MB 3/2006
Site 70 Final Proposed Plan 22 MB 3/2006
Site 70 Draft Proposed Plan 760 kB 11/2005
Site 74 - Skeet Range  
Site 74 Final Feasibility Study 8 MB 10/2014
Site 74 Draft Feasibility Study 10 MB 11/2013
Site 74 Final Tier II Ecological Risk Assessment 38 MB 4/2005
Site 75 - KAYO-SB Agricultural Well
Site 75 Final Groundwater Sampling and Analysis Report 7 MB 11/2019
NEW!  Site 75 Draft Groundwater Sampling and Analysis Report 39 MB 8/2018
Site 75 Final Sampling and Analysis Plan Addendum 10 MB  10/2016 
Site 75 Final Preliminary Assessment/Site Inspection Report 42 MB 9/2012
Site 75 Draft Preliminary Assessment/Site Inspection Report 41 MB 6/2012
Site 75 Final Preliminary Assessment/Site Inspection Work Plan 20 MB 6/2011
Site 75 Draft Preliminary Assessment/Site Inspection Work Plan 29 MB 4/2011
UST 229 - Building 229 Fuel Tank  
Site UST 229 Draft Extended Site Assessment Report 33 MB 5/2011
Site UST 229 Extended Site Assessment Final Work Plan 7.6 MB 3/2009
Site UST 229 Extended Site Assessment Draft Work Plan 7.4 MB 11/2008
UST 500 - Building 500 Former UST Site
Site UST 500 Final Site Assessment 18 MB 7/2014
Site UST 500 Draft Site Assessment 4.6 MB 5/2014
Site UST 500 Site Assessment Final Work Plan 7 MB 2/2013
Site UST 500 Site Assessment Draft Work Plan 2.8 MB 12/2012
Miscellaneous Documents
RAB Fact Sheet 290 kB 10/1994

Share This Page